RIGGING AND RENTAL OF TEMPORARY CRADLES
Part of the group, Giraffe Access provide a dedicated installation and rigging service for temporary work platforms.
PROFESSIONAL RIGGING & TEMPORARY CRADLE SOLUTIONS
WHY USE US?
Our service is built on a number of key factors, which we believe makes us unique in the temporary suspended platform market;
Trusted & Nationwide
30 years of supporting leading construction businesses on thousands of UK structures and projects. Access centres in London and Manchester cover the UK, supported by maintenance and logistics facility in the middle of the UK.
Engineering Expertise
In house qualified & experienced graduate engineers ensure that our solutions are engineering led for safety and efficiency. Using market leading software and close links to leading manufacturers, we can solve the most challenging access problems.
Compliance
The health and safety of our employees, customers and the public is at the forefront of our business. Safe working conditions and effective risk management is essential when working at height. We have extensive knowledge throughout the company, built up over many years of providing access solutions. Emphasis is directed at equipment maintenance, health & safety management, training & education and understanding of relevant legislation.
Equipment quality
Giraffe Access only use EU manufactured equipment from the leading manufacturers, Sky Climber and Altrex. As UK distributor for Sky Climber for over 30 years, we have access to the high quality hoists, safety devices and spare parts.
Maintenance regime
Our 20,000sq ft workshop and engineering facility was purpose built for maintenance of suspended cradle equipment. Machinery, test rigs and certification equipment ensures equipment is robustly maintained to ensure safety and efficiency. Trained technicians use manufacturer approved parts to repair and service all equipment before a Report of Thorough Examination is carried out prior to delivery to site.
Competency
Our commitment to team competency is underpinned by a group wide learning and education programme to ensure our riggers and technicians are trained, experienced and competent. From NVQs, apprenticeships, LEEA and industry training, our active investment in the team is critical to what we do.
"Because safety at height demands more than just a cradle"
APPLICATIONS and OUR RIGGING PROCESS
Our equipment is highly flexible allowing a safe working platform on a whole range of structures. Our team will draw from a deep level of experience across decades of providing access to such structures, further supported by an in house design and engineering team.
Key Applications
- Facade Repairs & Cladding Access — proven solutions for glass, curtain wall, and cladding installation across complex building geometries on commercial and residential buildings.
- Temporary Construction Access — scalable and efficient for high-rise builds and multi-storey refurbishments.
- Heritage & Iconic Structures — safe cradle rigs used at prestigious sites like the Palace of Westminster and the Walkie Talkie and Leadenhall “Cheesegrater”.
- Industrial & Offshore Platforms — rigging expertise for oil rigs, silos, tanks and factories
- Stadium and Entertainment venues - we have provided access on a range of structures from stadiums, theatres, cinemas.
- Over Water - temporary work platforms are highly effective on bridges, jetties, sea walls and light houses.
- Energy - we have supported projects on Nuclear power stations, dams, hydroelectric pipelines and onshore/offshore wind turbines.
Rigging Process
- Site Survey & Planning
We conduct thorough site visits to assess façade layouts, roof conditions and understand building loads.
- Cradle Rigging Design & Engineering
Our team produces detailed rigging plans and structural calculations, specifying suspension methods and load capacities.
- Equipment Setup
We deploy appropriate hoist, safety devices, platform and suspension gear—roof beams, monorails, davits, or customised solutions—tailored to your building.
- Cradle Installation & Commissioning
Rigging, platform erection, hoist setup, and full-system testing ensure safe operation.
- Compliance
We provide the appropriate testing and certification in line with Loler.
- Dismantling & Removal
Once works are complete, we efficiently remove all systems, leaving no trace and restoring the site.
Find out more
Below are a selection of recent projects, however our Case Studies include a number of more complex temporary suspended access projects, such as on the Walkie Talkie Building, the Houses of Parliament and Kings Cross.
Looking for dependable rigging for temporary suspended access?
Contact us for project-specific advice, site surveys, and customised cradle options. We’re here to support your access needs — safely, efficiently, and seamlessly.