BMU Replacement

ZARAFA INSTALL BMU ON ICONIC MANCHESTER BUILDING


The Zarafa team have recently completed the installation of a replacement BMU system on CIS Tower in Manchester.

The existing system required replacement and was removed from the building and replaced with a new system from Zarafa. 

WANT TO SEE MORE?

To view more of our Case Studies click the link below.
<< BACK TO CASE STUDIES
Share by: